- Solder wires to the electrode-film.
- Fix the soldering by stycast.
- Assemble the stressing spring: stack 47 by 2 conical
springs inside a teflon tube, make four sets.
- Assemble the cavity-plates with the detector housing, align the
plates by knocking pins.
- Solder the wires to MDM connectors.
- Fix the soldering by stycast.
- Assemble the detector block and the connectors with a support block.
Next: Fourth week - sixth
Up: Detector assembling procedure
Previous: Second week: fixing the